Dishwasher & Washing Machine Installation - SMI Handyman Leeds

What I do...


image of the inside of a washing machine - SMI Handyman Leeds, Horsforth



  • Check the connections: Before starting the installation, I ensure that the plumbing and electrical connections are in place. This includes a water supply line, a drain line, and an electrical outlet.
  • Position the machine: I slide the machine into place, making sure it’s level and fits under the countertop.
  • Connect the water supply: I connect the water supply line to the machine and check for leaks.


  • Connect the drain line: The drain line is connected to the sink drain or garbage disposal.
  • Connect to power: Finally, I plug in the machine to the electrical outlet and secure it under the countertop.





Professional

Fully qualified and licensed. Reliable, Professional and ensuring a quick turn around and professional service throughout.

5-Star Reviews

Call Now!

Call now for a quick, no-obligation quote or feel free to ask any questions about what you need doing or any new projects you have coming up.